Печать
04-4-1122-2015/2020
 
Priority: 1
   
Status: Extended
Development of Experimental Facilities for Condensed Matter Investigations with Beams of the IBR-2 Facility

 

Leaders:     S.A. Kulikov
V.I. Prikhodko


Participating Countries and International Organizations:
Argentine, Belarus, Bulgaria, Czech Republic, Germany, Hungary, Republic of Korea, Romania, Russia, South Africa, Sweden, Switzerland, Ukraine, United Kingdom. 

Scientific Programme:
Development and construction of a control system of the cryogenic moderator CM-201 for IBR-2 beams N 1, 4, 5, 6, 9. 
Design of equipment, electronics and software for the complex of IBR-2 spectrometers; 
development of the FLNP information and computing infrastructure according to the needs of the Laboratory 
and the development strategy of the JINR computer network. 

Expected main results in 2018:

List of projects:
  Project Leader Priority 
(period of realisation)
1. Development of PTH sample 
environment system for the DN-12 
diffractometer at the IBR-2 facility
A.N. Chernikov 1   (2015-2020)
2. BSD
Development of wide-aperture 
backscattering detector 
for HRFD diffractometer
V.V. Kruglov 1   (2018-2020)

 

List of Activities
  Activity or Experiment Leaders
Status
  Laboratory or other
Division of JINR
Main researchers
1. Development and putting into 
operation of control system of 
CM-201 moderator for neutron 
beams N 1, 4, 5, 6, 9
S.A. Kulikov
E.P. Shabalin
Realization
  FLNP M.V. Bulavin + 5 engineers, A.S. Kirilov + 1 engineer, A.P. Sirotin + 2 engineers, K.A. Mukhin
2. Calculations and simulation
of spectrometers’ elements. 
Development of VITESS 
software package
A.V. Belushkin
Realization
  FLNP S.A. Manoshin, S.A. Kulikov + 1 engineer
3. Investigation of radiation 
resistance of materials and 
electronic components
M.V. Bulavin 
S.A. Kulikov
Realization
  FLNP E.P. Shabalin + 4 engineers
4. Tests of combined
horizontal-vertical 
cryostat with superconducting 
magnet for DN-12 diffractometer. 
Development and modernization of 
cryostats on IBR-2 spectrometers.
A.N. Chernikov 
S.E. Kichanov
Realization
  FLNP E.V. Lukin, N.A. Kovalenko + 2 engineers
5. Development of continuous flow 
cryostats on the basis of 
closed-cycle cryocoolers
A.N. Chernikov
Realization
  FLNP N.A. Kovalenko + 2 engineers
6. Development and implementation
of gas and scintillation detector
systems at IBR-2 spectrometers
A.V. Churakov 
V.V. Kruglov 
A.A. Bogdzel
Realization
  FLNP V.M. Milkov + 3 engineers, V.A. Drozdov +3 engineers, V.V. Zhuravlev + 3 engineers, A.S. Kirilov + 1 engineer
7. Development of data acquisition
systems, control and experiment
automation systems, as well as of
software package Sonix+ at IBR-2 
spectrometers
V.I. Prikhodko 
A.P. Sirotin 
A.S. Kirilov
Realization
  FLNP A.A. Bogdzel + 4 engineers, V.V. Zhuravlev + 3 engineers, N.D. Zernin + 1 engineer, S.M. Murashkevich + 2 engineers
8. Development of FLNP network
infrastructure in accordance with
development strategy of JINR 
computer network
V.I. Prikhodko
Realization
  FLNP G.A. Sukhomlinov + 2 engineers, A.S. Kirilov 
+ 2 engineers, S.A. Manoshin + 1 engineer
  LIT V.V. Korenkov + 2 engineers

 

Collaboration
Country or International
Organization
City Institute or Laboratory
Argentina Bariloche CAB CNEA  
Belarus Minsk BSTU  
Bulgaria Sofia INRNE BAS  
Czech Republic Rez NPI ASCR  
Germany Berlin HZB  
  Julich FZJ  
Hungary Budapest Wigner RCP  
Republic of Korea Daejeon NFRI  
Romania Bucharest INCDIE ICPE-CA  
Russia Moscow NNRU "MEPhI"  
    NRC KI  
    PC ITER RF  
  Moscow, Troitsk INR RAS  
  Dubna Dubna Univ.  
  Gatchina NRC KI PNPI  
  Yekaterinburg IMP UB RAS  
South Africa Pretoria Necsa  
Sweden Lund ESS ERIC  
Switzerland Villigen PSI  
Ukraine L'viv LPNU  
United Kingdom Didcot RAL