04-4-1105-2011/2019
 
Priority: 1
   
Status: Being concluded


Development of the IBR-2 Facility with a Complex of Cryogenic Neutron Moderators

 

Leaders:     A.V. Belushkin
A.V. Vinogradov


Participating countries and international organizations:
Argentina, Azerbaijan, Belarus, Japan, Mongolia, Poland, Romania, Russia, United Kingdom, USA. 

Issues addressed and main goals of research:
The theme main task of the theme is to increase the efficiency of the use of the IBR-2 facility for realization of the program of experimental investigations, maintenance of operational reliability and safety of the reactor, creation of a complex of cryogenic neutron moderators. 

Expected major results in the current year:

  • Maintenance of the IBR-2 reactor operation for physical investigations. 

  • Assembling of a reserve movable reflector MR-3R at FLPN test bench. 

  • Putting into test operation of the CM-201 cryogenic moderator equipment at a working place. 

  • Step-by-step replacement and upgrading of the technological and electrical equipment in accordance with the Rostekhnadzor license requirements. 

List of projects:
  Project Leader Priority 
(period of realisation)
1. Construction of a Complex 
of Cryogenic Moderators 
at the IBR-2 Facility
A.A. Belyakov 1   (2014-2019)

 

List of Activities
  Activity or Experiment Leaders
Status
  Laboratory or other
Division of JINR
Responsible person
Main researchers
1. Operation of the IBR-2 facility 
in the regular mode
A.V. Dolgikh
A.V. Vinogradov
Realization
  FLNP M.V. Andrianov, A.A. Belyakov, Yu.N. Pepelyshev, S.V. Rudenko, S.A. Tsarenkov, V.A. Trepalin + 30 engineers, + 50 workers
2. Maintenance of program 
of physical investigations
A.V. Vinogradov
A.V. Dolgikh
Realization
  FLNP A.A. Belyakov, Yu.N. Pepelyshev, S.V. Rudenko, V.A. Trepalin + 30 engineers, + 50 workers
3. Installation and adjustment of 
equipment and pipelines of CM-201 
cryogenic moderator at test bench.
Test operation of equipment of 
CM-202 and CM-201 cryogenic 
moderators using a new cryogenic
facility by "Linde"
A.A. Belyakov
K.A. Mukhin
Realization
  FLNP S.A. Kulikov, E.P. Shabalin + 15 engineers, + 15 workers
4. Assembling of reserve movable 
reflector MR-3R
A.V. Vinogradov
A.V. Dolgikh
Realization
  FLNP A.A. Belyakov + 5 engineers, + 5 workers
5. Step-by-step replacement and 
upgrade of basic technological 
and electrical equipment
A.V. Vinogradov
A.V. Dolgikh
Realization
  FLNP A.A. Belyakov, A.V. Trepalin + 30 engineers, + 50 workers

 

Collaboration
Country or International
Organization
City Institute or Laboratory
Argentina Buenos Aires CNEA  
Azerbaijan Baku IRP ANAS  
    NNRC  
Belarus Minsk JIPNR-Sosny NASB  
Japan Osaka ISIR  
  Sapporo Hokkaido Univ.  
Mongolia Ulaanbaatar IPT MAS  
Poland Krakow AGH-UST  
Romania Bucharest IFIN-HH  
Russia Moscow NIKIET  
    Geliymash  
    INEUM  
    SYSTEMATOM  
    SSDI  
    ENES  
United Kingdom Didcot RAL  
USA Indianapolis, IN IUPUI