04-4-1105-2011/2022
 
Priority: 1
   
Status: In-progress


Development of the IBR-2 Facility with a Complex of Cryogenic
Neutron Moderators

Leaders:     A.V. Vinogradov
A.V. Belushkin
A.V. Dolgikh

Participating countries and international organizations:
Azerbaijan, Belarus, Mongolia, Poland, Romania, Russia, Spain.

Issues addressed and main goals of research:
The main task of the theme is to increase the efficiency of the use of the IBR-2 facility for realization of the program of experimental investigations, maintenance of operational reliability and safety of the reactor, creation of a complex of cryogenic neutron moderators.

Expected results in the current year:
  • Provision of the IBR-2 reactor operation for physics investigations.

  • Check assembling, adjustment and testing of the backup movable reflector MR-3R at the FLNP test bench. Experimental investigations on determination of dynamic characteristics and parameters of vibrations of the units and structure modules at the stage of assembly and bench testing of MR-3R.

  • Operation of the test stand of the cryogenic moderator CM-201. Installation of the cryogenic moderator CM-201 in the regular place and putting it into trial operation. Development of requirements specification and project documentation for the cryogenic moderator CM-203 for beamlines 2 and 3.

  • Phased replacement and upgrade of the basic technological and electrical safety-related equipment of the IBR-2 facility.

List of projects:
  Project Leader Priority
(period of realisation)
1. Construction of a complex
of cryogenic moderators
at the IBR-2 facility
K.A. Mukhin 1   (2014-2022)

List of Activities
  Activity or Experiment Leaders
Status
      Laboratory or other
    Division of JINR
Main researchers
1. Operation of the IBR-2 facility
in the regular mode
A.V. Dolgikh
A.V. Vinogradov
Realization
  FLNP M.V. Andrianov, A.A. Belyakov, Yu.N. Pepelyshev, S.V. Rudenko, S.A. Tsarenkov, V.A. Trepalin, 30 engineers, 50 workers
2. Provision of physics research
program
A.V. Vinogradov
A.V. Dolgikh
Realization
  FLNP A.A. Belyakov, Yu.N. Pepelyshev, S.V. Rudenko, V.A. Trepalin, 30 engineers, 50 workers
3. Experiments at the test stand of
CM-201 cryogenic moderator. Test
operation of equipment of CM-201 cryogenic moderator. Operation of
cryogenic moderators using new
cryogenic refrigerator by Linde in
the regular place
A.A. Belyakov
K.A. Mukhin
Realization
  FLNP E.P. Shabalin, 15 engineers, 15 workers
4. Assembling of backup movable
reflector MR-3R
A.V. Vinogradov
A.V. Dolgikh
Realization
  FLNP A.A. Belyakov, 5 engineers, 5 workers
5. Step-by-step replacement and
upgrade of basic technological
and electrical equipment
A.V. Vinogradov
A.V. Dolgikh
Realization
  FLNP A.A. Belyakov, A.V. Trepalin, 30 engineers, 50 workers
 
Collaboration
 

Country or International Organization

City Institute or laboratory
Azerbaijan Baku IRP ANAS
    NNRC
Belarus Minsk JIPNR-Sosny NASB
Mongolia Ulaanbaatar IPT MAS
Poland Krakow AGH-UST
Romania Bucharest IFIN-HH
Russia Moscow ENES
    Geliymash
    INEUM
    OKSAT NIKIET
    SSDI
    SYSTEMATOM
Spain Valencia UPV